Update on the Centennial Bridge On Monday, Hartman Construction poured the floor of the bridge. A pump truck was brought in to reach the 55 foot span of the bridge, and now, the concrete will be left to cure for a week until it’s ready for stone to be adhered to it. This process went […]
Continue readingMonthly Archives: March 2019
Roller Coaster
As I mentioned in my last post, the bridge installation, via crane, was set for last Friday. Everything was set in place and lined up. Last Tuesday/Wednesday we received over an inch of rain, with a rapid rise in temperatures, which lead to serious flooding to Walsh Lake. All of the snow melt, with no […]
Continue readingBridge and Course Update
A lot has happened since my last post on the bridge. All of the footing and abutment boxes have been set in place, precisely aligned, and at the exact elevations. The cement was then poured into the boxes. Luckily, the ice was so thick on Walsh Lake that we were able to drive […]