Messy Friday

Unfortunately the thunderstorms rolling through the metro is coming at the worst time. We do need the rain, but we’re now over 3.5″ for the week, and the soils were so dry and tight that it’s taking a lot longer than normal for the water to percolate downward. We cannot prepare the golf course for […]

Continue reading

Surface Drainage

When we rebuilt the 14th green last Fall, we excavated a lot of soil, some areas as much as 18″. The sub-grade of the green was built, with surface drainage having positive flow to the drainage inlet, and sod laid over the top of that. During construction, a common challenge is making sure you properly […]

Continue reading